Case Studies

Sewer Remediation at RAAF Base Tindal
Nuflow Top End was engaged to rehabilitate two aging corrugated steel stormwater pipes under a roadway near the RAAF Base

Restoring Cracked Stormwater Pipes at Stuart Highway Development
A newly constructed section of the Stuart Highway in Alice Springs faced a critical issue during its final inspection. Cracks

Restoring Structural Integrity to Frances Park Estate Stormwater Drainage
Frances Park Estate, a newly developed housing estate, faced significant setbacks due to damages in its recently installed stormwater drainage

Stormwater Remediation at RAAF Base Winnellie
Nuflow Top End was engaged to rehabilitate two aging corrugated steel stormwater pipes under a roadway near the RAAF Base