Case Studies

Stormwater Remediation at RAAF Base Winnellie
Nuflow Top End was engaged to rehabilitate two aging corrugated steel stormwater pipes under a roadway near the RAAF Base

Restoring Cracked Stormwater Pipes at Stuart Highway Development
A newly constructed section of the Stuart Highway in Alice Springs faced a critical issue during its final inspection. Cracks

Sewer Remediation at RAAF Base Tindal
Nuflow Top End was engaged to rehabilitate two aging corrugated steel stormwater pipes under a roadway near the RAAF Base

Restoring Structural Integrity to Frances Park Estate Stormwater Drainage
Frances Park Estate, a newly developed housing estate, faced significant setbacks due to damages in its recently installed stormwater drainage